DPF learned values
|
Shoutbox
Please don't use the shoutbox for complex questions! For those questions please create a thread in the right subforum.
ojha: i have a Audi 2021 i dont see the app to disable the auto start stop can someone help me I have the obd11 pro ver
Apr 22, 2024 15:09:40 GMT
johanmarx: Hi I bumped into an old post from you. I have a 2017 Amarok with Discover Media radio. There is no CAR menu. You said you have the solution? Please share your secret with me
Apr 22, 2024 16:09:18 GMT
rotutu: Anyone know why OBD11 doesn't let us change the circumference of the tire? my speedo is out to lunch after bigger wheels D4 A8 22 inch rims
Apr 24, 2024 2:36:41 GMT
smaxaustria61: hi, wie kann ich die elektrische Fesstellbremse zum Bremsscheibentausch lösen und wieder anlernen? VW Touareg II
Apr 24, 2024 12:25:28 GMT
seat5f8: I own a 2015 SEAT leon 5f8. I have a problem. when I open the rear door on the driver's side it shows me that the door on the other side is propped open. if I do it the other way around it shows me that the rear door on the driver's side is propped open.
Apr 24, 2024 15:50:14 GMT
seat5f8: I wonder if this can be solved by coding or if the sensors are connected incorrectly. And where should I look for these sensors?
Apr 24, 2024 15:50:17 GMT
whataboutthis: ste13 have you run a scan and if so what errors were reported
Apr 24, 2024 21:36:35 GMT
uhembako: I am getting a B10F201 Fault on my Audi A6 2021 US, i have cleared and still coming back. scan shows this to be something with the Outlet temperature sensor for left rear upper body vent. Any one know what this is and how to resolve this? Thanks
Apr 24, 2024 23:43:44 GMT
mrnoc: hi everyone, i have a tail light (interior left) problem. can you help me? forum.obdeleven.com/thread/21959/cupra-leon-light-problem-signal
Apr 25, 2024 6:53:40 GMT
mrnoc: hi everyone, i have a tail light (interior left) problem. can you help me? forum.obdeleven.com/thread/21959/cupra-leon-light-problem-signal
Apr 25, 2024 10:42:44 GMT
marjo89: hello,Does anyone know about the fault code u140b00 in audi a6 c7
Apr 25, 2024 14:29:05 GMT
mrfruth0326: Does the OBD11 dongle stay in the OBD2 port always, or just while diagnosing / programming?
Apr 26, 2024 0:58:37 GMT
whataboutthis: mrfruth0326 Dongle can stay in the OBD2 Port but make sure you close the app down when no using othewise some have issues with battery drain. Personally i have had mine in for years with no issues.
Apr 26, 2024 6:48:51 GMT
verdomde: Hello, my buddy just bought a golf 2021, came with only one key, the dealer seems to have sent him an un-paired key fob. Can it be paired with obdeleven it's e keyless entry one?
Apr 26, 2024 15:39:57 GMT
vaghelpers: Is there anyone who activates 2021 Tiguan MIB3 wireless carplay?
Apr 28, 2024 21:05:33 GMT
leonmk4: Hello, can you retrofit the full LED headlights? I have the fr model, but I have the standard LED headlights, not the "nice" ones.
Apr 30, 2024 5:39:05 GMT