|
Post by JMC on Nov 26, 2017 19:02:09 GMT
Hi, I tried to follow the instructions to do the voltage adaptation so that the start/stop would stop coming on. When I selected Gateway (control unit 19), I did not have the option to do an adaptation. There was one that said long adaptation. When I selected this, it asked me for a channel. Please could someone let me know if I am doing something wrong. Many thanks.
|
|
|
Post by krystian660 on Dec 7, 2017 7:22:00 GMT
|
|